{"id":3421,"date":"2026-03-11T12:21:31","date_gmt":"2026-03-11T12:21:31","guid":{"rendered":"https:\/\/energiasrenovableshg.com\/proyectos\/photovoltaic-installation-of-80-kw-in-tales-castellon-spain\/"},"modified":"2026-03-11T12:21:31","modified_gmt":"2026-03-11T12:21:31","slug":"photovoltaic-installation-of-80-kw-in-tales-castellon-spain","status":"publish","type":"proyectos","link":"https:\/\/energiasrenovableshg.com\/en\/proyectos\/photovoltaic-installation-of-80-kw-in-tales-castellon-spain\/","title":{"rendered":"Photovoltaic Installation of 80 kW in Tales (Castell\u00f3n, Spain)"},"content":{"rendered":"<p>In the town of <strong>Tales, in the province of Castell\u00f3n<\/strong>, a self-consumption photovoltaic installation has been implemented to optimize the energy efficiency of the electrical installation in the public playroom, significantly reducing its dependence on the electricity grid and its energy costs.<\/p>\n<p>The installation has a <strong>total installed power of approximately 80 kWp<\/strong>, consisting of <strong>127 bifacial 620 W photovoltaic modules from Hanersun<\/strong>, a technology that makes it possible to take advantage of both direct and reflected radiation, increasing the system&#8217;s energy yield compared to conventional modules.<\/p>\n<p>For energy conversion and management, an <strong>80 kW Sigenergy hybrid inverter<\/strong> has been installed, a high-performance device that allows advanced management of photovoltaic production and prepares the installation for future integration with battery storage systems.<\/p>\n<p>The photovoltaic modules have been arranged on the roof, optimizing orientation and inclination to maximize annual renewable energy production. The installation has been designed with efficiency, electrical safety and ease of maintenance in mind. <\/p>\n<p>One of the highlights of the project was the <strong>intervention on the main fa\u00e7ade of the building<\/strong>, where <strong>civil works<\/strong> were carried out <strong>to adapt the measuring point of the installation<\/strong>. Specifically, the following work was carried out: <\/p>\n<ul>\n<li><strong>Partial demolition of the existing exterior wall<\/strong>, where a small meter box was located.<\/li>\n<li><strong>Execution of a new standardized concrete niche<\/strong>, sized to correctly house the measuring equipment.<\/li>\n<li>Installation of the <strong>new metering system according to scheme 11<\/strong>, complying with the technical requirements of the distribution company.<\/li>\n<\/ul>\n<p>This action made it possible to <strong>modernize the electricity metering infrastructure<\/strong>, ensure compliance with current regulations and facilitate the reading, maintenance and energy management operations of the installation.<\/p>\n<p>With this <strong>80 kW<\/strong> photovoltaic installation, the customer will be able to generate a significant part of its electricity consumption through renewable energy, reducing CO\u2082 emissions and actively contributing to the energy transition.<\/p>\n","protected":false},"featured_media":3431,"template":"","class_list":["post-3421","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/energiasrenovableshg.com\/en\/wp-json\/wp\/v2\/proyectos\/3421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energiasrenovableshg.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/energiasrenovableshg.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energiasrenovableshg.com\/en\/wp-json\/wp\/v2\/media\/3431"}],"wp:attachment":[{"href":"https:\/\/energiasrenovableshg.com\/en\/wp-json\/wp\/v2\/media?parent=3421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}